Emerson NGA2000 TO2 Manuale delle Istruzioni

Navigare online o scaricare Manuale delle Istruzioni per Equipaggiamento per l’ossigeno Emerson NGA2000 TO2. Emerson NGA2000 TO2 Instruction manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 70
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
www.EmersonProcess.com
Instruction Manual
Chemiluminescence Detector
CLD Analyzer Module (combined with NGA 2000 Platform,
MLT, CAT 200 or TFID Analyzer)
1
st
Edition 06/2007
Instruction Manual
HAS60E-IM-HW
06/2007
Vedere la pagina 0
1 2 3 4 5 6 ... 69 70

Sommario

Pagina 1 - Instruction Manual

www.EmersonProcess.comInstruction ManualChemiluminescence DetectorCLD Analyzer Module (combined with NGA 2000 Platform,MLT, CAT 200 or TFID Analyzer)1

Pagina 2 - ESSENTIAL INSTRUCTIONS

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 4 Preface Emerson Process Management GmbH & Co.OHGSAFETY SUMMARYIf this equipment is used i

Pagina 3 - Table of Contents

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 5PrefaceEmerson Process Management GmbH & Co.OHGOVERBALANCE HAZARDThis analyzer module may

Pagina 4

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 6 Preface Emerson Process Management GmbH & Co.OHGINTERNAL UV SOURCE !Ultraviolet light fro

Pagina 5

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 7PrefaceEmerson Process Management GmbH & Co.OHGPOWER SUPPLYVerify the power voltage at sit

Pagina 6

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 8 Preface Emerson Process Management GmbH & Co.OHGELECTROSTATIC DISCHARGEAlthough the elect

Pagina 7

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 9PrefaceEmerson Process Management GmbH & Co.OHGGENERAL PRECAUTIONS FOR HANDLING AND STORIN

Pagina 8

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 10 Preface Emerson Process Management GmbH & Co.OHGDOCUMENTATIONThe following CLD instructi

Pagina 9

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 11PrefaceEmerson Process Management GmbH & Co.OHGGLOSSARY OF TERMSAnalyzer ModuleThe module

Pagina 10 - NGA 2000 CLD

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 12 Preface Emerson Process Management GmbH & Co.OHGPrimary VariableThe measured species con

Pagina 11

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDA - 1Analyzer System ArchitectureEmerson Process Management GmbH & Co.OHGANALYZER SYSTEM ARCHIT

Pagina 12

CLD Chemiluminescence Detector Instruction ManualHAS60E-IM-HW06/2007Emerson Process ManagementGmbH & Co. OHGIndustriestrasse 1D-63594 HasselrothGe

Pagina 13

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007A - 2 Analyzer System Architecture Emerson Process Management GmbH & Co.OHGThe modular configur

Pagina 14

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDA - 3Analyzer System ArchitectureEmerson Process Management GmbH & Co.OHGFigure A-3: Example/Po

Pagina 15

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007A - 4 Analyzer System Architecture Emerson Process Management GmbH & Co.OHGTable A-1: Possibili

Pagina 16

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD1 - 1Description and SpecificationsEmerson Process Management GmbH & Co.OHGSECTION 1DESCRIPTION

Pagina 17

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20071 - 2 Description and Specifications Emerson Process Management GmbH & Co.OHGFigure 1-2: Flow D

Pagina 18

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD1 - 3Description and SpecificationsEmerson Process Management GmbH & Co.OHGFigure 1-3: Flow Dia

Pagina 19

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20071 - 4 Description and Specifications Emerson Process Management GmbH & Co.OHGFigure 1-4: CLD An

Pagina 20

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD1 - 5Description and SpecificationsEmerson Process Management GmbH & Co.OHG1-5 SPECIFICATIONSa.

Pagina 21

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20071 - 6 Description and Specifications Emerson Process Management GmbH & Co.OHG

Pagina 22

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD2 - 1InstallationEmerson Process Management GmbH & Co.OHGSECTION 2INSTALLATION2-1 UNPACKINGIf t

Pagina 23

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDITable of ContentsEmerson Process Management GmbH & Co.OHGTable of ContentsPREFACE ...

Pagina 24

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20072 - 2 Installation Emerson Process Management GmbH & Co.OHGCAUTIONEXTERNALLY RESTRICT SAMPLE/CA

Pagina 25 - Regulator

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD2 - 3InstallationEmerson Process Management GmbH & Co.OHGb. ConnectionsConnect inlet and outlet

Pagina 26

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20072 - 4 Installation Emerson Process Management GmbH & Co.OHGLeak TestThe CLD Analyzer Module is

Pagina 27 - June 2007

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD2 - 5InstallationEmerson Process Management GmbH & Co.OHGFigure 2-4: CLD Wiring Diagram CABLE,

Pagina 28

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20072 - 6 Installation Emerson Process Management GmbH & Co.OHGFigure 2-5: Outline and Mounting Dim

Pagina 29

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 1OperationEmerson Process Management GmbH & Co.OHGSECTION 3OPERATION3-1 OVERVIEWOnce the CL

Pagina 30

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 2 Operation Emerson Process Management GmbH & Co.OHG3-3 PREPARATIONSAfter performing start-

Pagina 31

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 3OperationEmerson Process Management GmbH & Co.OHGFigure 3-3: Excerpt of a Test Data Sheet

Pagina 32 - REGULATOR

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 4 Operation Emerson Process Management GmbH & Co.OHG3-4 CALIBRATION PROCEDUREThe CLD analyz

Pagina 33

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 5OperationEmerson Process Management GmbH & Co.OHGCalibration ParametersThis menu provides

Pagina 34 - Dimensions:

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007II Table of Contents Emerson Process Management GmbH & Co.OHGSECTION 2 INSTALLATION ...

Pagina 35

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 6 Operation Emerson Process Management GmbH & Co.OHGb. Flow Balance Adjustment:To adjust th

Pagina 36 - 0.00 10.00Range 1

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 7OperationEmerson Process Management GmbH & Co.OHGNOTE:If you are using a span gas that has

Pagina 37

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 8 Operation Emerson Process Management GmbH & Co.OHG3-5 SYSTEM & NETWORK I/O MODULECONT

Pagina 38

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 9OperationEmerson Process Management GmbH & Co.OHGFigure 3-14: Signals MenuSignal value for

Pagina 39 - CAL NO/NOx

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 10 Operation Emerson Process Management GmbH & Co.OHGOutput(s) value on analyzer failure:Ch

Pagina 40

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 11OperationEmerson Process Management GmbH & Co.OHGb. Serial interface SetupThe submenu &qu

Pagina 41

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 12 Operation Emerson Process Management GmbH & Co.OHGc. Relay Outputs SetupThere are three

Pagina 42

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 13OperationEmerson Process Management GmbH & Co.OHG3-6 CONVERTER TEMPERATURE ADJUSTMENTThe

Pagina 43

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 14 Operation Emerson Process Management GmbH & Co.OHG3-7 MEASUREMENT OF CONVERTEREFFICIENCY

Pagina 44 - Operation mode:

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 15OperationEmerson Process Management GmbH & Co.OHG(b-a)(c-d)(80-85)(80-20)12. Close valve

Pagina 45

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDIIITable of ContentsEmerson Process Management GmbH & Co.OHGc. Relay Outputs Setup ...

Pagina 46

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 16 Operation Emerson Process Management GmbH & Co.OHGd. Replacement of ConverterIf the subn

Pagina 47

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD3 - 17OperationEmerson Process Management GmbH & Co.OHGFigure 3-23: Converter Test SetupNOX M

Pagina 48

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20073 - 18 Operation Emerson Process Management GmbH & Co.OHGFigure 3-24: Converter Temperature Adj

Pagina 49

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD4 - 1Maintenance and ServiceEmerson Process Management GmbH & Co.OHGSECTION 4MAINTENANCE AND SE

Pagina 50

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20074 - 2 Maintenance and Service Emerson Process Management GmbH & Co.OHG4-2 FUSESThe main power f

Pagina 51 - B. TYPICAL TEST RESULTS

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD4 - 3Maintenance and ServiceEmerson Process Management GmbH & Co.OHG4 Optional Bypass Flow Sens

Pagina 52

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20074 - 4 Maintenance and Service Emerson Process Management GmbH & Co.OHGFigure 4-2: Converter Ass

Pagina 53

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD4 - 5Maintenance and ServiceEmerson Process Management GmbH & Co.OHG4-7 DETECTOR DISASSEMBLYRef

Pagina 54

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20074 - 6 Maintenance and Service Emerson Process Management GmbH & Co.OHGFigure 4-3: Detector Asse

Pagina 55

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD4 - 7Maintenance and ServiceEmerson Process Management GmbH & Co.OHG4-8 LEAKAGE TESTThe gas pat

Pagina 56

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007IV Table of Contents Emerson Process Management GmbH & Co.OHGSECTION 6 REPLACEMENT PARTS ...

Pagina 57

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20074 - 8 Maintenance and Service Emerson Process Management GmbH & Co.OHGIf there is a leakage, th

Pagina 58

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD5 - 1TroubleshootingEmerson Process Management GmbH & Co.OHGSECTION 5TROUBLESHOOTING5-1 OVERVIE

Pagina 59

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20075 - 2 Troubleshooting Emerson Process Management GmbH & Co.OHG

Pagina 60

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD6 - 1Replacement PartsEmerson Process Management GmbH & Co.OHGSECTION 6REPLACEMENT PARTS6-1 MAT

Pagina 61

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20076 - 2 Replacement Parts Emerson Process Management GmbH & Co.OHG6-2 REPLACEMENT PARTS658157 Air

Pagina 62

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLD7 - 1Return of MaterialEmerson Process Management GmbH & Co.OHGSECTION 7RETURN OF MATERIAL7-1 R

Pagina 63

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 20077 - 2 Return of Materials Emerson Process Management GmbH & Co.OHG

Pagina 64

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDL - 1List of Figures and TablesEmerson Process Management GmbH & Co.OHGLIST OF FIGURES AND TABL

Pagina 65

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007L - 2 List of Figures and Tables Emerson Process Management GmbH & Co.OHGFigure 3-23: Converter

Pagina 66

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDEmerson Process Management GmbH & Co.OHG

Pagina 67

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 1PrefaceEmerson Process Management GmbH & Co.OHGPREFACEThe purpose of this manual is to pro

Pagina 68

NGA 2000 CLD HardwareInstruction ManualHAS60E-IM-HW06/2007© Emerson Process Management GmbH & Co. OHG 2007WORLD HEADQUARTERSROSEMOUNT ANALYTICAL

Pagina 69

NGA 2000 CLDInstruction ManualHAS60E-IM-HWJune 2007P - 2 Preface Emerson Process Management GmbH & Co.OHGIMPORTANTSAFETY INSTRUCTIONSWIRING AND

Pagina 70 - NGA 2000 CLD Hardware

Instruction ManualHAS60E-IM-HWJune 2007NGA 2000 CLDP - 3PrefaceEmerson Process Management GmbH & Co.OHGOPERATING AND MAINTAINING THIS APPARATUSThi

Commenti su questo manuale

Nessun commento